Construction Photo Gallery Week 6 - Roof rafters
Advanced Search
View Slideshow (Fullscreen)

Construction Photo Gallery

1. Students at... ... 5. Week 3 -... 6. Week 4 -... 7. Week 5 -... 8. Week 6 -... 9. Week 7 -... 10. Week 8 -... 11. Week 9 -... ... 18. One year later

Random Image

At Work 037

At Work 037

Date: 06/23/2006 Views: 290

Week 6 - Roof rafters

Date: 07/08/2006
Owner: Gallery Administrator
Size: 41 items
nextlast
Earthbags are measured, cut and sewn for the interior radiant wall

Earthbags are measured, cut and sewn for the interior radiant wall

Date: 06/30/2006
Views: 612
Electrical outbuilding 01 - Mesh is stapled to all wood and metal surfaces for future plaster adhesion

Electrical outbuilding 01 - Mesh is stapled to all wood and metal surfaces for future plaster adhesion

Date: 06/28/2006
Views: 388
Electrical outbuilding 02 - Detail showing mesh wrapping around a bottom corner on the sill plate

Electrical outbuilding 02 - Detail showing mesh wrapping around a bottom corner on the sill plate

Date: 06/28/2006
Views: 406
Electrical outbuilding 03 - Screws are added to the underside of the top plate and left exposed

Electrical outbuilding 03 - Screws are added to the underside of the top plate and left exposed

Date: 06/28/2006
Views: 432
Electrical outbuilding 04 - Adding screws that stick out allows for a better connection between plaster and wood

Electrical outbuilding 04 - Adding screws that stick out allows for a better connection between plaster and wood

Date: 06/28/2006
Views: 416
Electrical outbuilding 05 - The walls are misted with water to maintain plasticity

Electrical outbuilding 05 - The walls are misted with water to maintain plasticity

Date: 06/28/2006
Views: 447
Electrical outbuilding 06 - Earthen plaster is applied to the building

Electrical outbuilding 06 - Earthen plaster is applied to the building

Date: 06/28/2006
Views: 483
Electrical outbuilding 07 - Earthen plaster is applied to the building

Electrical outbuilding 07 - Earthen plaster is applied to the building

Date: 06/28/2006
Views: 396
Electrical outbuilding 08 - Looking east we see the west side and entrance

Electrical outbuilding 08 - Looking east we see the west side and entrance

Date: 06/30/2006
Views: 419
nextlast
Page: 1 2 3 4 5
Powered by Gallery v2.2