|
Earthbags are measured, cut and sewn for the interior radiant wall
Date: 06/30/2006
Views: 612
|
Electrical outbuilding 01 - Mesh is stapled to all wood and metal surfaces for future plaster adhesion
Date: 06/28/2006
Views: 388
|
Electrical outbuilding 02 - Detail showing mesh wrapping around a bottom corner on the sill plate
Date: 06/28/2006
Views: 406
|
|
Electrical outbuilding 03 - Screws are added to the underside of the top plate and left exposed
Date: 06/28/2006
Views: 432
|
Electrical outbuilding 04 - Adding screws that stick out allows for a better connection between plaster and wood
Date: 06/28/2006
Views: 416
|
Electrical outbuilding 05 - The walls are misted with water to maintain plasticity
Date: 06/28/2006
Views: 447
|
|
Electrical outbuilding 06 - Earthen plaster is applied to the building
Date: 06/28/2006
Views: 483
|
Electrical outbuilding 07 - Earthen plaster is applied to the building
Date: 06/28/2006
Views: 396
|
Electrical outbuilding 08 - Looking east we see the west side and entrance
Date: 06/30/2006
Views: 419
|