Construction of the KOC Sustainable Living Centre

Home | The Students | Sustainable Building Explained | Location | Curriculum

Login
Construction Photo Gallery Week 1 - Groundwork
Advanced Search
View Slideshow (Fullscreen)

Construction Photo Gallery

1. Students at... 2. Views of... 3. Week 1 -... 4. Week 2 -... 5. Week 3 -... 6. Week 4 -... 7. Week 5 -... ... 18. One year later

Random Image

Bale raising 06 - Bales are sewn together with twine passing through the whole wall with a large needle

Bale raising 06 - Bales are sewn together with twine passing through the whole wall with a large needle

Date: 07/13/2006 Views: 424

Week 1 - Groundwork

Date: 05/18/2006
Owner: Gallery Administrator
Size: 37 items
nextlast
Empty site, looking South

Empty site, looking South

Date: 05/11/2006
Views: 837
Heating tube 1 - trench dig

Heating tube 1 - trench dig

Date: 05/11/2006
Views: 569
Heating tube 2 - 100 ft of big O pipe

Heating tube 2 - 100 ft of big O pipe

Date: 05/11/2006
Views: 918
Heating tube 3 - evidence of water at about 10 feet

Heating tube 3 - evidence of water at about 10 feet

Date: 05/11/2006
Views: 585
Heating tube 4 - filled back to 9 feet

Heating tube 4 - filled back to 9 feet

Date: 05/11/2006
Views: 595
Heating tube 5 - insulated with used carpet and scrap Styrofoam SM

Heating tube 5 - insulated with used carpet and scrap Styrofoam SM

Date: 05/11/2006
Views: 730
Heating tube 6 - used carpet to insulate heating tube trench bottom

Heating tube 6 - used carpet to insulate heating tube trench bottom

Date: 05/11/2006
Views: 719
Heating tube 7 - big O laid on top of insulation and wrapped on vertical rise

Heating tube 7 - big O laid on top of insulation and wrapped on vertical rise

Date: 05/11/2006
Views: 504
Heating tube 8 - trench filled

Heating tube 8 - trench filled

Date: 05/11/2006
Views: 613
nextlast
Page: 1 2 3 4 5
Powered by Gallery v2.2