Construction of the KOC Sustainable Living Centre

Home | The Students | Sustainable Building Explained | Location | Curriculum

Login
Construction Photo Gallery Week 3 - Foundation and structural framing
Advanced Search
View Slideshow (Fullscreen)

Construction Photo Gallery

1. Students at... 2. Views of... 3. Week 1 -... 4. Week 2 -... 5. Week 3 -... 6. Week 4 -... 7. Week 5 -... 8. Week 6 -... ... 18. One year later

Random Image

Electrical outbuilding 08 - Looking east we see the west side and entrance

Electrical outbuilding 08 - Looking east we see the west side and entrance

Date: 06/30/2006 Views: 419

Week 3 - Foundation and structural framing

Date: 06/06/2006
Owner: Gallery Administrator
Size: 39 items
nextlast
Electrical outbuilding 1 - Earthbag guidlines painted on base

Electrical outbuilding 1 - Earthbag guidlines painted on base

Date: 05/30/2006
Views: 777
Electrical outbuilding 2 - Full-width earthbags are packed with clay and tamped

Electrical outbuilding 2 - Full-width earthbags are packed with clay and tamped

Date: 05/30/2006
Views: 610
Electrical outbuilding 3 - The earthbag foundation takes shape

Electrical outbuilding 3 - The earthbag foundation takes shape

Date: 05/30/2006
Views: 602
Electrical outbuilding 4 - Two courses of earthbags are all that's needed

Electrical outbuilding 4 - Two courses of earthbags are all that's needed

Date: 05/31/2006
Views: 591
Electrical outbuilding 5 - Flashing made from strips of steel roofing are attached to the earthbags

Electrical outbuilding 5 - Flashing made from strips of steel roofing are attached to the earthbags

Date: 06/02/2006
Views: 633
Foundation 01 - Barbed wire between earthbag courses is snaked back and forth

Foundation 01 - Barbed wire between earthbag courses is snaked back and forth

Date: 05/29/2006
Views: 700
Foundation 02 - Old roofing material is cut and bent for use as flashings

Foundation 02 - Old roofing material is cut and bent for use as flashings

Date: 05/29/2006
Views: 588
Foundation 03 - Detail of external corner showing how the flashing was fitted to the foundation

Foundation 03 - Detail of external corner showing how the flashing was fitted to the foundation

Date: 05/30/2006
Views: 646
Foundation 04 - The entranceway flashing requires multiple bends

Foundation 04 - The entranceway flashing requires multiple bends

Date: 05/31/2006
Views: 633
nextlast
Page: 1 2 3 4 5
Powered by Gallery v2.2